Projects

Category
Close
Showing
0
of
0
Projects
true
5621
  • Imported custom cladding for fire retardance and weathering
  • Complex 7m tall concrete pillars with curved profiles
  • Live school environment requiring flexible programming
  • Polished sprung sports flooring
Education
true
5479
  • Permatimber cladding (95% recycled polymer)
  • Polycarbonate feature windows
  • Intercomms to all rooms
  • Hydronic heating
Education
true
5580
  • Imported Swisspearl cladding designed for fire retardance and extreme weather resistance
  • Modwood timber decking serviced by large double glazed sliders
  • Extensive landscaping incl. both synthetic and natural materials
  • Live operating environment which required flexible and cooperative programming
Education
true
3174
  • Live and operational secure site in a primary school
  • Exposed structural steel continuing from interior to exterior
  • Feature 40 x 40 spotted-gum timber work in entrance / foyer
  • Complex circular window installation on internal and external walls
Education
Government
true
3073
  • Portal steel frame with Colorbond cladding
  • Significant civil component including drainage, asphalt and curbing
  • Petrol and diesel bowsers with underground oil separator system
Industrial
true
2631
  • Portal steel framework with insulated panel roofing
  • Working safely within a live and operational environment
  • Exotec claddings on offices and classrooms
  • Large portal steel frame erected with 90t cranes
Education
true
2562
  • Structural steel portal frame
  • Acoustic linings throughout with double-glazing
  • 1300m2 complex 3D roof in the shape of the letter “Y”
Education
Government
true
0305
  • Imported aerated ceramic Clinka blocks
  • Internal fit-out with aluminium glazed partitions
  • Extensive, decorative, milled silver-top gum facade
Commercial
true
5100
  • Rendered Hebel Powerwall through the building core
  • Vitricore Powdercoated cladding to both north and south facades
  • 6-Star energy rating including a double glazed window suite
  • Demolition, civil and landscaping
Commercial
true
5490
  • Maxiply Fireshield flame resistant timber sheeting
  • Concealed, flush and safety fixings employed to protect the children
  • Complex joinery in a range of materials required exceptional attention
  • Large variety of techniques, suppliers and materials required
Education
true
0312
  • Structural steel with commercial glazing
  • Alucabond cladding
  • Cantilevered shade canopies
  • Laboratory with specialist finishes and treatments
Commercial
true
4059
  • Challenging green-fields site with drainage complicating the build
  • Contract included the surrounding civil component
  • 450 custom Barestone and Vitrapanel pre-coated cladding panels
Government
false
5738
  • Precast panels with structural steel and brickwork
  • Complex dowelling between slab and precast panels
  • Epoxy flooring with line marking
  • Civil works including car parks and curbing
Commercial
false
5546
  • Steel framing with both steel and brick cladding
  • Glazed face brickwork adjacent conventional bricks
  • Aerated, curved and polished concrete landscaping blocks
Education
false
4100
  • Joinery package with new bathrooms and staffroom kitchenette
  • External brickwork with new aluminium window and door suite
  • Planar panel system
Education
false
3071
  • Portal steel frame with Colorbond cladding
  • Significant civil component including drainage, asphalt and curbing
  • Full security upgrade to secure the site
Industrial
false
3070
  • Portal steel frame with Colorbond cladding
  • Significant civil component including drainage, asphalt and curbing
  • Full security upgrade to secure the site
Industrial
false
3075
  • Portal steel frame with Colorbond cladding
  • Significant civil component including drainage, asphalt and curbing
  • Petrol and diesel bowsers with underground oil separator system
Industrial
false
3500
  • Extensive demolition within an operating, live environment
  • Detailed joinery package with natural timber finishes
  • High profile job with very tight time frame
Commercial
false
2164
  • Hydraunic refrigeration in a large slab
  • Tight timeframe in an complex and operational site
  • Structural steel, tilt slab and coolroom panelling
Industrial
false
1720
  • Demolition to retain existing superstructure and exposed beams
  • Complex inverted eave lines
  • Internal joinery construction and fit-out
Government
false
0315
  • Alucabond and glazed brick cladding
  • Sensitivity to adjacent residential properties
  • Car park and civil works
Health
false
0510
  • Large underground car park with shotcrete walls
  • Imported kitchens coordinated within the program for cost savings
  • Four level development with internal lift
Commercial
false
2850
  • 2500m2 Colorbond roof
  • Complex formwork for the concrete ramp
  • Construction within an operational site with trader cooperation
  • Traffic mgt for 40t cranes and concrete trucks on the main street
Commercial
false
4328
  • Demolition and replacement of claddings
  • Collaboration with the community
Government
false
4140
  • Suspended Bondek slab with under slab storage
  • Custom joinery package produced in our in-house joinery
  • Double glazed aluminium window and door suite
Commercial
false
3822
  • Exotec external cladding
  • Constructions with a live school and kindergarten environment
  • Traffic mgt. complexities around school pick-up / drop-off times
Education
Government
false
0328
  • Structural steel with sandstone block-work cladding
  • Commercial kitchen fit-out and epoxy flooring
  • Demolition prior to construction
  • Exceptionally tight timeline
Government
false
4461
  • Custom designed and fabricated caging installations
  • Delivered within a live and operational site
  • Remote location requiring extensive planning and travel
Government
false
1656
  • Extensive steel joinery and commercial compliant kitchen finishes
  • Tight time frame requiring excellent planning
  • Solid hardwood joinery and benchtops
Commercial
false
0127
  • Construction techniques and conditions specific to this industry
  • Flexible arrangements from HR+E to contract works
  • Available on-call for urgent or time sensitive works
  • Strong relationship over 20 years
Maintenance
false
2560
  • Curved birch ply joinery
  • Autex acoustic pin board cladding
Education
false
0007
  • Design and Construct project
  • Collaborative project with successful outcomes for all
  • Complex and dangerous construction environment
  • 22m wide door and 23m wide gantry crane
Industrial
false
0358
  • Design and Construct project
  • Complex excavation and trenching
  • Tilt slab boxed and poured on site by Kubale Constructions
  • Sound proofed interior walls and firewall
Commercial
false
0314
  • Significant excavation and planning for pool and spa construction
  • Extensive Crazy Stone cladding
  • Complex planning and logistics given no road access to site
  • Built without permanent site power and water
Commercial
false
4170
  • Custom splash-back materials
  • Full joinery package with curved geometry
  • Bold colours and extra-durable finishes
  • Tight timeline and budget controls
Government
false
0348
  • Precast panel construction
  • Complex operational site incl. managing risks to public safety
  • Fire protection materials and design features throughout
  • Heavy gauge steel window covers within Exotech cladding
Health
false
0363
  • Operational site with safety complexities
  • Construction completed with minimal noise
  • Largely conventional techniques
Health
false
0374
  • Expansive excavation and subterranean concrete works
  • Significant contribution to formwork design prior to construction
  • Night works and traffic management required
  • DuraPanel acoustic ceilings constructed and raised on-site
Industrial
false
4216
  • Prefabricated buildings
  • Quick turnaround
  • Long-term relationship built on trust
Government
false
3411
  • Construction techniques and conditions specific to this industry
  • Flexible arrangements from hourly-rate to contract works
  • Available on-call for urgent or time-sensitive works
  • Strong relationship that’s growing quickly
Maintenance
false
1390
  • Design and Construct project
  • Steel framed Colorbond clad sheds
  • Atco portable building modules
Industrial
false
0331
  • Custom in-house jigging and repetitive manufacturing techniques
  • Handling of 8 metre x 500 kg massive steel and timber structures
  • Large scale adhesive application and long continuous seam welding
  • Tight scheduling and the ability to scale up and down
Industrial
false
0317
  • Portal steel frame with Colorbond cladding
  • Civil components including drainage, asphalt and curbing
  • Boundary security upgrade to secure the site
Commercial