Preston Pump Station

No items found.

The Preston Pumping Station contract follows various successful projects undertaken by Kubale Constructions for the Water Resources Alliance. As our fourth contract with this client, this project represents the trust that the Alliance partners had in our relevant expertise and ability to get the job done.

This project involved very complex subterranean structural concrete works requiring over 500 tonnes of concrete and a vast quantity of reinforcement, much assembled on site. Our staff contributed to the design of the formwork and the mix of the concrete poured in recognition of our experience in complex slab work.

Included in the construction schedule was a mains pressure reducing valve pit and an industrial acoustic ceiling built from DuraPanel. These large panels were built on the ground and craned into position forming a seamless sound dampening barrier.

This was a complex project involving night works and difficult traffic management given the location on High Street Preston. This project was successfully completed on time and within budget.

Construction Techniques Employed
  • Expansive excavation and subterranean concrete works
  • Significant contribution to formwork design prior to construction
  • Night works and traffic management required
  • DuraPanel acoustic ceilings constructed and raised on-site

"Dear Kubale Constructions, we want to say thanks for everything you’ve done over the past year. We are thrilled with the end product which is a credit to you and your crew. If anyone is ever after a reference, please give them my number!"

Andy
Private Client
,

"I would highly recommend Kubale Constructions for any large or technical building project. Their experience, professionalism and communication make working with and managing their contract simple and frustration free.”

Senior Project Engineer
, Baw Baw Shire

"I am writing to provide positive feedback for the workmanship and the professional work you and your team are doing on site. Specifically, you’ve done an excellent job in Morwell and the engineers have no comments or concerns for the slab works."

Name withheld – project in progress
Superintendent Representative
,

"On behalf of the President and Members of the Lions Club of Warragul, I would like to thank you for your assistance and professional support during the construction of our new facilities. Your expertise and advice was most valuable."

Jeff Tolley
Secretary, Lions Club
,
  
, Baulderstone / Melbourne Water