Nowa Nowa Facilities Depot

No items found.

Nowa Nowa was one of four projects awarded to Kubale Constructions by DEWLP as part of a facilities upgrade in East Gippsland for their fire-fighting fleet. This site was designed to facilitate the storage and maintenance of their new Unimog and G-Wagon vehicles including a large and separate dangerous goods storage shed.

After demolition of the existing buildings was complete, significant civil works were undertaken on the road and drainage including asphalt and curbing. New buildings of approximately 850m2 were erected on slabs using conventional steel portal frames and clad with Colourbond. Individual bays were built for each of the 10 vehicles it could house.

The contract included the installation of self-bunded diesel and petrol storage tanks, bowsers, a large canopy, bollards and an underground Pureceptor oil and water separator tank system. The site was then completed with a full security upgrade including access control, CCTV, and large sliding palisade gates.

This project was handed over within budget and on time to a satisfied client.

Construction Techniques Employed
  • Portal steel frame with Colorbond cladding
  • Significant civil component including drainage, asphalt and curbing
  • Petrol and diesel bowsers with underground oil separator system

"On behalf of the President and Members of the Lions Club of Warragul, I would like to thank you for your assistance and professional support during the construction of our new facilities. Your expertise and advice was most valuable."

Jeff Tolley
Secretary, Lions Club
,

"I would highly recommend Kubale Constructions for any large or technical building project. Their experience, professionalism and communication make working with and managing their contract simple and frustration free.”

Senior Project Engineer
, Baw Baw Shire

"Thank you for your excellent problem solving skills and advocacy for us during the build. Thank you especially for your negotiations with the authorities and engineer on our behalf. What would usually takes weeks or month, you achieved in days or hours."

Daniel
Private Developer
,

"I am writing to provide positive feedback for the workmanship and the professional work you and your team are doing on site. Specifically, you’ve done an excellent job in Morwell and the engineers have no comments or concerns for the slab works."

Name withheld – project in progress
Superintendent Representative
,
  
, Dept. of Environment, Land, Water & Planning