Projects
/

Kurnai College Administration

No items found.

Prior to construction, staff demolished existing facilities and cleared the site. Our contract was to construct over 500 square metres of new administration building (within an operational site). The design included staff rooms, a reception area with feature lighting, kitchenette, joinery, toilets, and several multipurpose rooms with custom pin boards.

The scope of works included a minimal landscaping package with large curved, aerated polished concrete blockwork forming s-shaped seating for students and staff. Site drainage was included within the existing civil context, and a covered connection between the new and existing buildings was constructed/completed.

Construction Techniques Employed
  • Steel framing with both steel and brick cladding
  • Glazed face brickwork adjacent conventional bricks
  • Aerated, curved and polished concrete landscaping blocks

"I am writing to provide positive feedback for the workmanship and the professional work you and your team are doing on site. Specifically, you’ve done an excellent job in Morwell and the engineers have no comments or concerns for the slab works."

Name withheld – project in progress
Superintendent Representative
,

"Dear Kubale Constructions, we want to say thanks for everything you’ve done over the past year. We are thrilled with the end product which is a credit to you and your crew. If anyone is ever after a reference, please give them my number!"

Andy
Private Client
,

"We keep choosing Kubale for our projects because they take ownership of challenges as they arise. We're growing with them, and their culture of honesty is rare, and a relief in this game."

Rajeev
Industrial Maintenance Client
,

"Thank you for your excellent problem solving skills and advocacy for us during the build. Thank you especially for your negotiations with the authorities and engineer on our behalf. What would usually takes weeks or month, you achieved in days or hours."

Daniel
Private Developer
,
  
, VSBA